How it works

How the eQiik Pro works

Tap the buttons on the remote and see what each one does. Or press “Take the tour” and we'll show you everything, step by step, with subtitles.

The animation is sped up: a real wash lasts about 90 seconds, drying about 3 minutes and nozzle self-cleaning about 60 seconds. Temperatures are approximate.

Manual and installation

Installation and user manual · eQiik Pro

Everything you need to install and use your eQiik or eQiik Pro: safety, step-by-step installation, using the remote and maintenance. Both models are installed and used in the same way; only the lid is different: on the eQiik it doesn't open or close by itself, and its remote doesn't have the lid or seat buttons, so what the manual says about automatic opening only applies to the Pro. You can read it here or download the full manual as a PDF (in Spanish and English).

Download the eQiik Pro manual (PDF)

Before you start

  • Install with the power and water turned off
  • We recommend having it fitted by a plumber
  • Earthed Schuko 220 V socket

In the box

  • Remote control and flexible hose
  • Angle valve and sealing gasket
  • Cable with safety device

Bathroom requirements (eQiik Pro)

  • Floor outlet, waste pipe 200–210 mm from the wall
  • Water pressure 0.14–0.75 MPa
  • Schuko socket (220 V) nearby

Installation, step by step

  • Clean the floor and fit the angle valve
  • Apply sealant and align with 2 people
  • Fix with silicone and wait 48 h

Using the remote

  • Rear, feminine and child wash
  • Drying, heated seat and massage
  • ECO mode and night light

Maintenance

  • Clean the mesh filter every 1–2 months
  • Surfaces: soft cloth and mild detergent
  • Nozzle self-cleaning from the remote

Download the eQiik Pro manual so you always have it to hand.

Download the eQiik Pro manual (PDF)

Before installing

How your bathroom needs to be set up

Both models, eQiik and eQiik Pro, are installed in the same way and in the same place as your current toilet. You just need the waste outlet, stopcock and a socket ready. Show this page to your plumber and it'll be sorted in no time.

Installation diagram for the eQiik and eQiik Pro: waste outlet 20 or 21 cm from the wall, stopcock and socket 20 cm above the floor and 25 cm from the centre line, one on each side
Diagram of the eQiik and eQiik Pro (they're installed the same way). Measurements for guidance only. View the full-size diagram — so you can send it to your plumber.

Floor outlet, 20 or 21 cm from the wall

Aligned with the centre line of the toilet. It's the standard measurement for a toilet with a floor outlet, and the eQiik and eQiik Pro accept both.

Stopcock on one side

20 cm above the floor and 25 cm from the centre line. Accessible, so you can turn off the water without moving the toilet.

Socket on the other side

20 cm above the floor and 25 cm from the centre line, opposite the stopcock. A standard 220 V earthed socket.

Left or right, it doesn't matter

You can put the stopcock on the left and the socket on the right, or the other way round. What matters is that they're one on each side.

Check your bathroom in a minute

Measure from the wall to the centre of your current toilet's waste outlet: if it's 20 or 21 cm, you're fine. And check there's room for 68 cm depth, 42 cm width and 49 cm height without hitting the door or any furniture.

Important: the stopcock and the socket must be one on each side of the toilet, in plain view. Never behind it or hidden, because otherwise you couldn't turn off the water or unplug it.

Not sure? Send us a photo of your bathroom and we'll tell you whether it fits, no strings attached. Message us on WhatsApp.